Pollution Control with Profit from Effluent Treatment Plant for Fish Processing Unit
By Anaerobic Process using UASB


Capital Cost = Rs. 1,20,00,000 /-

Total Saving Due To = Rs. 37,32,480 /- p.a.
Power Generation (96 KWH)

Total Saving Due To = 600 m3/day @ Rs.20/m3= Rs.39,60,000/- p.a.
Water Recycle

Recovery per annum = Rs. 39,60,000 + Rs. 37,32,480 = Rs. 76,92,480 /-

Pay Back Period = 2.5 to 3 Years.

Design Data

Title

Inlet
Outlet
Flow
960m3 / Day
960m3 / Day
pH
6-8
5.5 - 9.0
BOD
1800-2200 mg/L
< 30 mg/l
COD
2500-3000 mg/L
< 250 mg/l
Suspended Solids
1 - 2 %mg/L
< 100 mg/l
Oil & Greases
1600-2000 mg/l
< 10 mg/l

ADVANTAGE :-

• Biogas Generations = 15360m3/day
• Costing the Plant can be Recovered in Just 6 Months.
• Minimum Operation & Maintenance Cost
• No External Power Requirement for ETP.

SALIENT FEATURES :

• COD Reduction :- 60 - 65%
• Gas Generated :- 0.5 to 0.55 m3 biogas per kg COD destroyed
• Anaerobic process thus oxygen from external source not required and no limitation of a transfer of oxygen which is sparingly soluble.
• Practically no power requirement since no internal mixing /aeration required.
• Generation of methane rich biogas which can be used to generate power
• Minimal sludge production due to higher sludge retention time

ADVANTAGE :-
• Biogas Generation is 1150m3/day (96 KWH)
• Cost of the Plant can be Recovered in Just 3 Years
• Minimum Operation & Maintenance Cost
• No External Power Requirement for ETP.
• Water can be Recycled after Tertiary Treatment

SALIENT FEATURES :-
• COD Reduction :- 80 – 85%
• Biogas generated :- 0.5 to 0.55m3 kg COD reduced
• Anaerobic process thus Oxygen from external source not required and no limitation of a Transfer of oxygen which is sparingly soluble.
• Practically no power requirement since no internal mixing /aeration required.
• Generation of methane rich biogas which can be used to generate power
• Minimal sludge production due to higher sludge retention time.

 

 
Kerala (Kinfra ETP, Alapuzha MSW) Tamil Nadu (MLD RO  SYSTEM PERUNDRAI, 0.6 MLD RO  SYSTEM, MELVISHARAM, 2.5MLD  RO SYSTEM SIDCO RANIPET, 3.0MLD  RO SYSTEM , RANITECH, 3.0MLD  RO SYSTEM DINDIGAL, MSW PALAVAPURAM, MSW PERUNGADI) Maharshstra (30 MLD STP NANDED, PRIA CETP, PARLI ETP, PARAS ETP, 12MLD CETP, ICHALKARANJI, 1.5 MLD CETP ICHALKARANJI, NBCC MEDICAL COLLEGE  PAREL, VASHI DENTAL HOSPITAL, ANDHERI HOSPITAL, MSW NAVI MUMBAI, MSW PARBHANI, MSW AHMEDNAGAR) GOA - MSW GOA GUJARAT (VAPI CETP, 7.5 MLD WTP PETHAPUR, BARODA Storm water line) MADHYAPRADESH (1.5 MLD CETP PITHAMPUR, Shivpuri STP) RAJASTAN (10 MLD STP Sikar, 8 MLD STP & Drainage Nagaur, 10 MLD STP Barmer, MSW BARMER, MSW PALI, MSW BEAWAR, MSW KOTA, MSW SRI GANGA NAGAR) BIHAR (WATER SUPPLY, KHAGAUL PATNA, WATER SUPPLY,PHULWASARIF ZONE 1&2 PATNA, WATER SUPPLY,PHULWASARIF ZONE  3&4 PATNA) UTTAR  PRADESH (345 MLD STP LUCKNOW, 40MLD STP AGRA, 23 MLD Mainpuri, 43 MLD Jajmau, MSW RAIBARELY, MSW KANNAUJ, MSW ETAWAH, MSW MAINPURI) HARYANA (3.5 MLD STP NARWANA, 40MLD STP ROHTAK, MSW ROHTAK, 6 MLD STP Narnaul NBCC, 5 MLD STP Charkhi-NBCC) NEW DELHI (45MLD  STP FARIDABAD)